OUTLINE SPECIFICATION - Welcome To The City Of Lowell ...
Installation of new street lighting and foundations as indicated on Glazing gaskets shall be EPDM elastomeric Transmit to the Architect a written guarantee from each of the Mechanical Contractors stating that the work provided under these specifications is guaranteed against ... Content Retrieval
Touch Local - YouTube
The company sells all the top brands such as Panasonic and Sony. Hawk Roofing - Roofing Contractors in Maidstone. They offer services such as New Roofs, Slate Roofing, Tiled Roofing, Roof Repairs, EPDM Rubber Roofing, Flat roofs in felt, Lead Work, Velux Windows, Asphalt Roofs, Upvc ... View Video
2007 STICK Program - Word文档下载,word文档免费下载 ...
Applications including fire-rated, Commercial Roofing: The Fundamentals. The program is AIA/CES accredited offering 1 Leaning Credit. We will also briefly cover lighting and maintenance of the parking lot. ... Doc Retrieval
Specification Section Checklist - Mc Carty Group
The Commercial General Liability shall provide at a minimum EPDM Membrane Roofing Fully Adhered Mechanically Fastened going on at project site to keep track of standard and fire-rated gyp.bd. the practice is to only provide fire-rated except where a special board is required, such ... Retrieve Document
High Performance Green Schools Guidelines - P-12 : NYSED
Signs should be lighted from the top down if feasible and use spot lighting fixtures, not flood light fixtures. Of particular importance is the delineation of the contractors’ responsibilities regarding Enhanced EPDM products are designed to perform in more rigorous ... Fetch Doc
VA-263-11-RP-0376 VA-263-11-RP-0376_1.docx
Seal joints and penetrations. At door openings, install Class C, ¾ hour fire/smoke rated doors with self-closing devices. 2.Install one EPDM roofing membrane, with related insulation, E.National Roofing Contractors Association: Roofing and Waterproofing Manual. ... Read More
Comal ISD
Indicate rated walls and building separations, areas to receive fire Commercial chemical for weed control registered by Environmental Protection Agency and USE A DESIGN COMPLYING WITH NATIONAL ROOFING CONTRACTORS ASSOCIATION REQUIREMENTS. 14 ACCEPTABLE ... Document Retrieval
This Old House - YouTube
Share your videos with friends, family, and the world ... View Video
FM Terms And Abbreviations Standard - Central Michigan University
Fire rated assembly Fire rating Roof top unit Roof vent Roof ventilator Roofing Room Room air conditioner Room monitor system Root mean square Ethylene propylene diene monomer Evacuate Evaporate Evaporating cooling unit ENCL ENGY EER EMS ENG ENGR EWA ... Retrieve Document
VA-250-11-IB-0057 FCA-BLDG #64 EXTER WALL REPAIR (FTD)-BID ...
07 22 00 Roof and Deck Insulation 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 07 60 00 Flashing and Sheet At door openings, install Class C, ¾ hour fire/smoke rated doors with self Isolate top of veneer stone from horizontal structural framing members and slabs or ... Access Document
PA Solar - Syreen
Refrigeration, appliances, lighting, televisions, computers, stereos, and more. Residential energy use follows a typical pattern. some municipalities issue permits for such work only to licensed contractors, An Alternate Energy Technologies AE-32 collector is rated at 27,500 Btu/day. ... Access This Document
San Francisco Education Session Information For AIA/CES And ...
Commercial building features are often designed to have a “Wow” factor such as an Using a flat rock on top of an irregular boulder formation to provide for a There is a plethora of contractors promoting themselves as water feature designers and builders but how can you ... Document Retrieval
SECTION 15000 - GENERAL MECHANICAL REQUIREMENTS
Washington, D.C. 20314 CID Commercial Item Description. (BF): Top Soils that contain no rock larger than 2 inches at greatest dimension. If expansive clays are present, Seal non fire-rated wall openings with urethane caulk. ... Read Full Source
PATIENT CARE PROJECT MANUAL
Contractors DO NOT have the authority to turn utilities off or on. including temporary lighting, may be left exposed in areas of public or staff access. If a rated fire, smoke, or corridor wall is penetrated, ... Access This Document
SECTION 03301 - CAST-IN-PLACE CONCRETE
It shall be the Contractors responsibility to receive permission from and coordinate with all authorities having jurisdiction over all temporary facilities and Where needed provide lighting, including flashing D. Remove no more existing roofing than can be covered in one day by ... View Document
FACILITY DESIGN CRITERIA Y@AL - Matanuska-Susitna Borough, Alaska
Provide for a commercial washer, Sills of clerestory windows are to be a minimum of 24 inches above the top of the roofing material. there have been significant problems with fire rated "solid core" wood doors because of insufficient rails and stiles for hardware. Once the hardware ... Access Full Source
Chapter 1
Heating, cooling, ventilating, lighting, and operating buildings accounts for approximately 42% of the energy generated in contractors and owners must work diligently to assure the most efficient (about 6 inches) and rod the top layer with 25 strokes penetrating the top of the ... Access Document
NJHEPS Third Edition
Rated Energy Performance of Windows 8-2. 1.4 Aluminum designers and contractors of high performance building projects proactively The use of sun-controlled top lighting such as roof monitors may allow for a more even distribution of daylight within classrooms, libraries ... Read Here
Specification Section Checklist - Mc Carty Group
The Commercial General Liability shall provide at a minimum the following coverage: EPDM Membrane Roofing Fully Adhered Mechanically Fastened Loose Laid-Ballasted. Non-Rated Doors Non-Rated Frames Fire-Rated Doors Fire-Rated Frames. ... Read Content
No comments:
Post a Comment